Free Software Downloads and Reviews at www.criticalfiles.com
Search Software
Software Reviews | Our Awards | Most Popular | New & Updated

Fix Corrupted Msprojectserver Software

Programs 1-10 of 50 Pages: 1 2 3 4 5 [Next]
Nucleus Kernel for ZIP - Repairs corrupted ZIP archive files.
Kernel recovery for ZIP repairs corrupted ZIP archive files
Nucleus Kernel for ZIP - Repairs corrupted ZIP archive files.
Kernel ZIP - Corrupted Archive Recovery 4.02
Kernel for ZIP - recover files from corrupted ZIP archives corrupted due to incomplete download, virus attacks or CRC errors. During repairing process a complete scan of the damaged ZIP file is performed to locate and extract the recoverable information. After the complete scanning the files which are recoverable are recovered and copied in the used defined location.
10 / 10
ZIP Repair 4.02
Kernel recovery for ZIP recovers files from corrupted ZIP archives corrupted due to incomplete download, virus attacks or CRC errors. During repairing process a complete scan of the damaged ZIP file is performed to locate and extract the recoverable information. After complete scanning, the files which are recoverable are recovered and copied at the user defined location.
8 / 10
Kernel ZIP - Repair Corrupt ZIP Files 4.02
Kernel for ZIP - recover files from corrupted ZIP archives corrupted due to incomplete download, virus attacks or CRC errors. During repairing process a complete scan of the damaged ZIP file is performed to locate and extract the recoverable information. After the complete scanning the files which are recoverable are recovered and copied in the used defined location.
7 / 10
Kernel Paradox - File Repair Software 4.03
Kernel for Paradox - recovers corrupted .DB paradox database files corrupted due to unexpected system shutdown etc. Kernel for Paradox - corrupted database recovery software supported versions includes Supports file versions 3.0, 3.5, 4.0, 4.5, 5, 6, 7, 9 and 10 Paradox databases.
7 / 10
Recovery for SQL Server 2.3.0742
Recovery for SQL Server recovers damaged Microsoft SQL Server database files (.MDF/.NDF). It creates Transact-SQL script that re-creates the database from the scratch. Recovery for SQL Server is able to recover corrupted tables, views, stored procedures, triggers etc. Both standard and user-defined data types recovery is supported. Also repairs damaged primary keys, unique key, indexes, foreign keys. Supports MS SQL Server 6.5, 7.0, 2000, 2005.
7 / 10
Kernel BKF - Corrupt Backup File Repair 4.05.01
Kernel BKF File Repair - recovers files from corrupted BKF archives corrupted due to backup interruption, virus attacks or CRC errors. Kernel BKF is a professional file repair tool to repair corrupt Microsoft backup (BKF) files. Kernel for BKF preserves original file creation dates. Search option available to search and locate the required files.
6 / 10
RiteRecovery 1.0.0728
RiteRecovery retrieves files from corrupted file systems: diskettes, hard disks, ZIP cartridges and other types of media, removable or non-removable. RiteRecovery saves the recovered files and folders into a folder on a safe drive. Is able to recover damaged disks with FAT12, VFAT12, FAT16, FAT32 and VFAT12 volumes created. CD/DVD file system recovery is supported as well including CDFS and UDV.
6 / 10
Kernel DBF - Repair corrupt DBF files 5.01
Kernel Recovery for DBF, recovers corrupted DBF database files corrupted due to unexpected system shutdown, virus attacks or error reading media where databases are stored. The Software uses Live Preview technology. After complete scanning, the database contents which are recoverable are shown in the preview window. Software supported DBF databases are Visual FoxPro, dBASE III, dBASE IV, dBASE 5 for dos, dBASE 5 for Windows, FoxBase etc.
6 / 10
MediaHeal for Flash 1.0.0719
MediaHeal for Flash retrieves files from corrupted flash cards. MediaHeal for Flash scans corrupted file system and saves the recovered files and folders into a folder on a safe drive. Restored are all types of flash cards, including pen drives, CF I/II, MMS, SD, xD, MemorySticks and many others.
6 / 10
Memory Card Rescue Utility 3.0.1.5
Tool undelete deleted smart media lost files folders data un-format damaged unreadable card JPG JPEG snaps recover malfunctioned card. Memory card deleted music recovery tool retrieve accidentally deleted photographs mobile phone sD secure digital xD extreme digital card pictures images rescue formatted 3gp songs support restoration of inaccessible digital camera compact flash bmp video clips gif files multimedia compact flash card.
6 / 10
Programs 1-10 of 50 Pages: 1 2 3 4 5 [Next]